Montana Expansion v0.3 ATS
v0.3
MT200 work between Lewistown and Circle –
major terrain re-work in Gelndive removing dozens and dozens of needless terrain pieces –
v0.2.6
fix invisble walls at new interchanges on I15 in Great Falls –
added Billings improvements –
forest road to Lewistown lumbermill fixed –
v0.2.5
3rd I15 interchange in Great Falls re-built along with alot more terrain pieces removed –
Billings improvements –
Scale triggers exiting Billings scale corrected –
Speed limit on I90 in Billings now 65 all the way through on the interstate –
dozens on needless terrain pieces removed from Billings –
buisness added for Forsyth –
company not inside city limit corrected (was the new Kalispell truckstop) –
v0.2
re-built 2 I15 interchnages at Great Falls –
Billings and Lewistown work –
removed dozens of needless terrain pieces in Great Falls –